Residential Housing Development Stage 1 Rose Street Parkes

  • Project value$3,723,545.27
  • Project scheduleConstruction commenced
  • Contractor nameSME Pty Ltd

Project Overview

Stage 1 - Current works (Lots 12 - 15 and 26 - 30)

Stage 1 focuses on delivering 9 lots with the existing infrastructure along the frontages of Rose Street and Ainsworth Street. Key works include:

  • Obtaining a Development Application (DA) Modification for Stage 1.
  • Completing detailed design and obtaining a Subdivision Works Certificate.
  • Constructing the On-Site Detention (OSD) system for the full subdivision, if funding allows.
  • Upgrading sewer and potable water services to all Stage 1 lots.
  • Installing other utilities, including power, lighting, NBN, and inter-allotment drainage.
  • Constructing retaining walls and swales to direct stormwater flows to the OSD for future stages.
  • Building footpaths and landscaping in accordance with the approved Urban Design Plan.

Stage 2 – Future Works (Lots 1-11 and 16-21)

Stage 2 will include the development of the remaining lots and supporting infrastructure:

  • Construction of new roads and associated infrastructure.
  • Installation of utilities, including power, lighting, sewer, water, NBN, and inter-allotment drainage.
  • Completion of retaining walls for Stage 2.
  • Earthworks for remaining lots.
  • Construction of footpaths and landscaping.

 

Project Updates

The project made strong progress, with continuation of installation of sewer and stormwater lines from stage 1 lots to their connection points, detailed excavation of retaining wall footings and commencement of block retaining walls.  Upcoming works will focus on construction of retaining walls, completion of SW works in the lower segment of the site, completion of sewer pipeline across Rose Street, replacement of K and G to Rose and Ainsworth streets and commencement of Electrical/ NBN in ground works.

Picture1.png
Picture2.png
Picture3.png
Picture4.png
Picture5.png
Picture6.png

Next Steps

  • Complete last sewer pipework and connections
  • Complete retaining wall backfill
  • Complete stormwater works
  • Commence power upgrade and NBN works
  • Commence placement of topsoil and site leveling

Location